Utrecht Town Hall: a light structural system based on functional diagonals

Built partly over the Central Station, the iconic new Town Hall in the Dutch town of Utrecht was conceived as a vertical landscape. Unique is not only its shape, but also its structural design that resulted from its complex location. ArcelorMittal supplied steel sections in HISTAR® grade and composite flooring deck for the building's structure.

The new Utrecht Town Hall, designed by Kraaijvanger Architects, stands on a promising yet extremely complex location, namely partly beside and partly on top of the new station concourse developed by Benthem Crouwel Architects. Making both the station concourse and the municipal offices accessible from the plateau above the railway tracks and platforms formed one of the challenges. The complexity of this design assignment was increased by the planned transport hub for bus and express tram connections at ground level.

Architectural design

The lower three levels of the town hall, located between ground level and public level, are used for parking and for technical facilities. Together, they form a podium at public level approximately 7.5 metres above ground level, linking up with the station concourse above the railway tracks and platforms. Particular attention was devoted to connecting the area on both sides of the tracks by means of a central boulevard, which hangs above the tracks alongside the new station concourse and opens up on the western side into the area in which the town hall and the station concourse meet. The building's entrance hall is located on this central boulevard.

From the public plateau, the first few levels are intended for public functions. Three floors (6, 11, and 21) serve as meeting places (plazas) and are characterised by their higher ceilings. The other levels house office space.

The shape of the building is determined by a combination of three types of buildings: the public foyer divided between the first five floors, the surrounding, rectangular building element that crosses above the station's roof, and the divided towers. In terms of construction, the layout is based on relatively few supports with large-scale forces instead of the usual even distribution. Due to the great depth of the building, larger empty spaces have been created in various places by means of atriums and inner courtyards in a semi outdoor climate for optimum daylight access and a pleasant work environment.

The architects wanted to prevent the town hall becoming an icon of bureaucracy, even if only due to its size. It was therefore important that the working areas and the public foyer had a visual relationship with each other, and that the building opened itself up to the public. This communicates the literal transparency of local government and creates an inspiring, open building. The relatively small footprint of the building meant that not all public functions could be housed on the same floor. Instead, they are divided over several levels around a large, spacious atrium. In this regard, it is important that these floors are not situated directly above one another but instead are staggered and stick out. This creates multiple lines of sight and views. From the entrance hall, there is a view of a subtropical inner garden on the first floor and a four-storey-tall window.

The stacking of three types of building and the varied daylight cut-aways produce different results on every floor. These sections connect the floors with each other to form a vertical landscape. In this way, different functional possibilities are created per floor, the visibility of and for the public is increased, and the scale of the building is kept modest. The public foyer, the outdoor space, the daylight zones, and the working areas are all spatially connected within the compact layout.

Structural design & ArcelorMittal steel

Due to its complex location, the town hall required a special structural design. The construction - which follows the periphery - is visible in the building's facade. It doesn't follow a purely right-angled system, but rahter a system of fully functional diagonals which transfer the vertical loads in the facade. Together with the north tower's concrete cores, these diagonal elements also provide stability to the building.

The south tower, built right over the Central Station, is supported by only five mega columns that cut through the Public Transportation Terminal. A complex 3D structure transfers the loads from the south tower to the columns.

ArcelorMittal Europe – Long Products supplied around 8000 t of steel sections, 5000 of which were HD sections in HISTAR® 460 grade, used as columns in the town hall's structure. Furthermore, ArcelorMittal Building Solutions' Cofraplus® composite steel deck was used in the project to constribute to the weight reduction of the structure.

Project information

  • Utrecht
  • Netherlands
  • 2009 - 2014
  • Architect:
    Kraaijvanger
  • Client:
    City of Utrecht
  • Developer:
    NS Poort
  • Engineering firm:
    Zonneveld Ingenieur
  • Steel fabricator:
    ASK Romein - Oostingh Staalbouw
  • Contractor:
    Boele Van Eesteren, G&S Bouw
  • Photographer:
    © Stijn Poelstra & Kraaijvanger
City Hall Utrecht © Stijn Poelstra

City Hall of Utrecht

Stadskantoor Utrecht

Built partly over the Central Station, the iconic new City Hall in the Dutch town of Utrecht,  was conceived as a vertical landscape.
Application(s)
Structures
Flooring
Location
Stadsplateau 1
Utrecht, Netherlands
Architect
Kraaijvanger Architectn
Year
2014

Technical details

More case studies with HISTAR®

Case study

Bay Adelaide East: The world's first steel structure designed with HISTAR®/ASTM A913 Grade 70

Case study

Delft city hall and train station: An unforgettable arrival with HISTAR® & IFB

Case study

LEED Gold certified: HISTAR® steel lightens the Hearst Tower's external diagrid structure

Case study

ArcelorMittal's HISTAR® steel optimises The Bow's external diagrid structure

Case study

A functional and efficient steel structure by ArcelorMittal for Galliker's car centre in Switzerland

Case study

HISTAR®: The best solution for the Shanghai World Financial Centre's innovative structure

Case study

Rolled HISTAR® beams instead of welded girders: structural optimisation for a road bridge project in Poland

Case study

One World Trade Center and HISTAR® steel: slender, safe, and sustainable

Case study

HISTAR® steel sections reduce cost and time for the construction of Marsa Viaduct in Warsaw

More case studies with Cofraplus®

Case study

Poznań Castle Cultural Centre: Modernisation with Cofraplus® composite flooring

Case study

The transparent structure of the Vienna City Landing Stage with Cofraplus® 77