How can you reduce the carbon footprint of infrastructure projects?

European countries have set stringent targets on carbon footprint reduction for the next years and decades in the general range of 35-50% by 2030. Like many other industries with quite a large carbon footprint, ArcelorMittal has committed to achieving a net-zero carbon footprint by 2050. These vital targets for the planet require a number of changes in all industries, which take time. So, how can we significantly reduce the carbon footprint of any new infrastructure project right away?

Published: 20 April 2023

Design optimisation and beyond

Reducing the carbon footprint of infrastructure projects is fairly straightforward, but it requires a paradigm shift within public administrations, private investors, and contractors. By using simple, yet efficient procurement strategies, investors can foster solutions with a much lower carbon footprint, but ecological solutions are seldomly the cheapest. Hence, the construction industry needs to implement innovative, transparent, and fair tender procedures capable of achieving the right balance between higher costs and lower environmental impacts.

Design optimisation is definitely one way to reduce the consumption of natural resources and reduce the environmental footprint of new projects. Optimisation is a never-ending challenge for architects, engineers, and construction companies. This technical article, based on ArcelorMittal Sheet Piling’s ‘Implementation of environmental criteria in civil engineering (infrastructure)’ brochure, provides a few complementary strategies using steel sheet piles as an example product used worldwide in infrastructure projects.

Combined steel sheet pile wall

Steel sheet piles

Steel sheet piles are typically used for permanent applications in civil engineering - predominantly for infrastructure and foundations, such as the construction of quay walls, retaining walls, underground car parks, or bridge abutments. Additionally, sheet piles are used for temporary applications, such as watertight cofferdams or deep excavation in urban areas.

One of the key advantages of sheet piles from a financial and environmental point of view is that they can be driven into the ground and easily recovered after their service life and either reused several times before being recycled or directly recycled.

Life Cycle Assessments & Environmental Product Declarations in a nutshell

In very simple terms, a Life Cycle Assessment (LCA) analyses all of the environmental burdens of a product (or service) during its life cycle. It encompasses the extraction of all the raw materials and their further processing and transport, the manufacturing of the product, any additional processing before installation at the jobsite, the use phase, the dismantlement, and finally the reuse or recycling of the product.

An Environmental Product Declaration (EPD) is a weighted average of the environmental footprint of a product based on its diverse applications, and it is the result of several LCAs of a single product. An EPD covers the manufacturing of a product over a specific period of time (usually one year) whereas an LCA considers the life cycle of the product, which can vary from a very short period of time to many years depending on the application.

Global Warming Potential of two alternatives in LCAs for the construction of a quay wall

Be aware of the challenges of LCAs and EPDs, but make good use of them

The values of the various indicators stated on an EPD depend on the assumptions made, and although it might seem odd, the results also depend on the software and database that was used, and consequently, on the version of these tools. Hence, when using or comparing data from EPDs, it is recommended to use EPDs from the same program operator, and if this is not possible, to analyse the influence of the assumptions and calculation methods on the results of the EPDs.

Furthermore, a project-specific LCA relies on a design. Changes to the design or to the manufacturing of the product can substantially modify the conclusions of an LCA. The design of civil engineering structures is quite a long and dynamic process with its limitations on reliability of costs and techniques, and it can evolve quickly. Hence, an LCA should be performed at every stage of the project and especially when selecting the contractor.

Note also that some impacts on society cannot be expressed through an EPD or an LCA. The quantities of material that need to be delivered to a construction site have a direct environmental impact calculated in an LCA, but other indirect and non-financial effects should be considered like traffic in urban areas due to the transport of the building elements or noise and vibrations due to the installation. Unfortunately, the financial impact and the effect on the well-being of people living in the area is difficult to estimate. Consequently, choosing prefabricated light and compact elements, as well as solutions that can be finished faster, are an environmentally judicious choice.

Ensure environmental criteria are met: the ‘monetisation’ scheme

A small number of European countries have started implementing environmental criteria in their public procurement procedures in the civil engineering of infrastructure. One example is in the Netherlands, where they ensure environmental criteria are met via a ‘monetisation’ scheme for public tenders that leads to the most sustainable solution based on the most economically advantageous tender. It relies predominantly on EPDs and LCAs to compare alternatives so that the investor can select the most sustainable solution: the best compromise between cost and environment based on a scientific approach.

This scheme is based on a weighting method applied to multiple environmental indicators either from national EPDs or from generic data contained in a national database, resulting in a single Environmental Cost Indicator (ECI) for each product. The calculated overall ECI encompasses the quantities of the materials that have a large impact on the environmental footprint of the project and is converted into a financial credit (see Fig. 3 for an example) that is subtracted from the overall price. As such, the contract is not necessarily awarded to the contractor with the lowest bid. This approach is an incentive for contractors and manufacturers to invest in R&D and to optimise design and execution in order to reduce the environmental impact of a project. The advantage of this method is that the ECI integrates the effect of multiple environmental indicators and the total quantities of material supplied, thus preventing a shift from one environmental indicator or product to other ones. It is not limited to the carbon footprint. While this scheme brings positive results, the drawback for manufacturers active in several European markets is the need for ‘national’ EPDs.

Below is an illustrative example: the cheapest solution (Sol. 4) has a much higher environmental footprint than the first two, whereas the lowest environmental impact (ECI) is attained with the costliest solution (Sol. 1). The question that remains is: which premium is the investor ready to pay for more sustainable and durable solutions?

Fig. 3: Example of a fictional discount (credit) allocated to a contractor’s bid based on environmental criteria (ECI) in a Dutch public tender
Illustrative example: monetisation solutions

Take into account the total Life Cycle Cost

It is also important to consider the total Life Cycle Cost of a selected product. For example, as sheet piles can be reused several times and 100% recycled, it is important to include the burdens or benefits of the end-of-life phase and beyond via Modules C and D of European standard EN 15804, which are the dismantling, reusing, and recycling of the building elements. For civil engineering, an LCA is a reasonably fair and transparent method to compare different solutions and suppliers.

Example: For an underground car park with a service life of 100 years, the probability that the sheet piles will be reused after the service life is quite low, but recycling of the sheet piles is quite probable. Additionally, as the steel is in direct contact with saturated soil, corrosion may have an impact on the quantity of steel that can be recycled.

These parameters influence the values of the indicators of Modules C and D and should not be neglected in a project-specific LCA. Although not required by ISO and EN standards, an LCA is more accurate and realistic when it uses specific EPDs from the producers rather than collective EPDs or generic data from databases.

Key take aways

  • Make good use of EPDs. EPDs should be worked out by environmental experts that are also specialised in the industry and applications for which the EPD is created. Collective EPDs or generic data from public databases are a nice tool to compare alternatives at a feasibility stage or design stage for instance, but when it comes to the comparison of alternatives at the tender stage, a specific EPD from the manufacturer of the product that will be installed is the most appropriate.

  • For each project, a specific LCA based on data from product-specific EPDs adapted to the project-specific assumptions should be performed at every design and execution stage.

  • Take into account the total Life Cycle Cost in an LCA. This is generally most accurate when done with specific EPDs from the manufacturers.

  • Environmental criteria should be integrated into the design and purchasing procedures, for instance by using the ‘monetisation’ method implemented in the Netherlands.